Detail Design

Detail Design

Detail Design Engineering Services include comprehensive planning, structural calculations, technical drawings, material specifications, and engineering solutions to ensure accurate and efficient project execution.

Our Projects

4-laning Of Phagwara To Hoshiarpur Road (Nh 344b) Including Phagwara & Hoshiarpur Bypass Under Bharatmala Pariyojna (Design Length: 48.622 Km) In The State Of Punjab On Hybrid Annuity Mode
Client – Path India LTD.
Tender Amount - 1553 Cr.

Project On Going

Construction Of Four Lane Ring Road/bypass Around Srinagar City From Km 0.000 To Km 42.100 (Phase-i) On Engineering, Procurement And Construction (Epc) Mode Under Nhdp Phase Vii In The Union Territory Of Jammu & Kashmir
Client – Nkc Projects Pvt LTD.
Tender Amount - 1446.21 Cr.

Project Completed

Detail Engineering For Construction Of 4-laning Of Rai Malikpur ( Haryana / Rajsthan Border )- Narnaul Mohindergarh- Charkhi Dadri- Bhiwani Kharak Corridor, Section From Km. 94+600 To 125+920 Of Nh-148b In The State Of Haryana (Package-iv) On Epc Mode , Total Length-31.32kms
Client – Ceigall- Shiva Buildtech
Tender Amount - 1201.7 Cr.

Project Completed

Development Of Six Lanebasanwahi - Marangpuri Section Of Nh-130-cd Road From Km 99+500 To Km 124+661 Under Raipur-visakhapatnam Economics Corridor In The State Of Chhattisgarh On Hybrid Annuity Mode (Package - Cg-3) (Length 25.161 Km)
Client – Kmv Projects LTD
Tender Amount - 1161.29 Cr.

Project Completed

Improvement And Up-gradation Of Existing Road To 4 Lane With Paved Shoulder From Km 123.650 To Km 175.080 From Start Of Shahbad Bypass To End Of Hardoi Bypass Of Nh-731 On Ham Basis In The Starte Of Uttar Pradesh. (Package-2b)
Client – Raj Corporation LTD
Tender Amount - 1101.79 Cr.

Project On Going

Construction Of Four-lane Beas Batala Dera Baba Nanak National Highway From Start Of Batala Bypass Near Village Acchal To Intersection With Ajnala Gurdaspurhighway, Nh 354 Near Dera Baba Nanak (Km 31+300 To Km 69+100) Including Additional Batala Bypass (Length 10 Km) On Epc Mode Under Bharatmala Pariyojna In The State Of Punjab
Client – Var Aha Infra LTD
Tender Amount – 1003.38 Cr.

Project Completed

Construction Of Four-lane Greenfield Delhi-amritsar-katra Expressway From Junction With Patiala Bathinda Road (Nh-7) Near Bhawanigarh To Junction With Ludhiana-malerkotla Road (Sh-11) Near Bhogiwal Village (Km 188+830 To Km 225+770) On Epc Mode Under Bharatmala Pariyojna In The State Of Punjab
Client – Ceigall India LTD.
Tender Amount - 983.33 Cr.

Project Completed

4 L-aning Of Basukinath To Deoghar Section Nh 114-a From Design Krn 85.081 To Design Km 130.240 (Design Length 45.159 Km) In The State Of Jharkhand On Hybrid Annuity Mode (Fiam)
Client – Allone Infra Pvt Ltd.
Tender Amount - 919.7 Cr.

Project On Going

Improvement And Up-gradation Of Existing Road To 4 Lane With Paved Shoulder From Km 88.750 To Km 123.650 From Shahjahanpur Bypass To Start Of Shahbad Bypass Of Nh-731 On Ham Basis In The Starte Of Uttar Pradesh. (Package-2a)
Client – Raj Corporation LTD
Tender Amount - 877.1 Cr.

Project On Going

CONSTRUCTION OF FOUR LANE HIGHWAY FROM GAZIPUR- BALLIA- UP/BIHAR STATE BORDER (GREENFIELD) SECTION OF NH-31: PACKAGE I (FROM HRIDAIPUR (KM 0.000) TO SHAHAPUR (KM 42.500)| ON EPC MODE IN THE STATE OF UTTAR PRADESH
Client – Ravi Infra Build Projects Pvt. LTD
Tender Amount - 845.28 Cr.

Project On Going

Construction Of Expressway From Km 91+400 To Km 120+250 (Junction With Jind-karnal Road (Nh-709a) Near Alewa Village To Junction With Ambala-kaithal-hissar Road (Nh-152) Near Kharak Pandwa Village Section Of Delhi-amritsar-katra Expressway) In The State Of Haryana On Hybrid Annuity Mode.
Client – Nkc Projects Pvt LTD.
Tender Amount - 838.5 Cr.

Project Completed

Fourlaning Of Haridwar Nagina Section Of Nh-74 From Km 0.000 (Design Chainage Km 0.000) To Km 73.000(Design Chainage Km 71.614) In The States Of Uttarakhand And Uttar Pradesh Under Nhdp Phase-iv On Epc Mode
Client – M/s Pawan Kumar
Tender Amount - 827 Cr.

Project Completed

Rehabilitation And Upgradation Of Watul To Talgaon Section Of Nh-17 (New Nh-66) From Existing Km 332/200 To Km 367/200 (Design Km 165+270 To Km 198+528) In The State Of Maharashtra To 4-lanes With Paved Shoulder On Epc Mode Under Niidp-iv
Client – M/s Kcc Buildcon Pvt. LTD
Tender Amount - 809.5 Cr.

Project Completed

Upgradation Of Mehsana-visnagar–vadnagar–kheralu-idar Section From Km 0/00 To Km 81/300 Of Nh 168g (Mehsana To Idar) In The State Of Gujarat (Total Length 81.300 Km) On Hybrid Annuity Mode (Ham)
Client – Ravi Infrabuild Projects Limited
Tender Amount - 784.71 Cr.

Project On Going

Four Laning Of Nh-75 From Existing Km 218+500(Village Khajuri) To Existing Km 259+640 (Wyndhamganj/up Border)in The State Of Jharkhand Onhybrid Annuity Mode.(Section V)
Client – Mg Banshidhar Pvt. LTD
Tender Amount - 773.76 Cr.

Project On Going

Four Laning Of The Project Highway From End Of Pinjore Bypass- Nalagarh Section (Km.4+200 To 35+395) Of Nh-105 (Old Nh-21 A) In The State Of 11aryanaandhimaciialpradeshontheepcmode
Client – Patel Infrastructure LTD
Tender Amount - 731.67 Cr.

Project On Going

Detailed Engineering For Four Laning Of Obedullaganj To Itarsi Section Of Of Nh-69 From Km 2+800 To Km8+300 And Km20+700 To Km 63+000 In The State Madhya Pradesh (Length Approx. 41KMS)
Client – Nkc Projects Pvt LTD
Tender Amount - 687.82 Cr.

Project Completed

CONSTRUCTION OF EIGHT LANE CARRIAGEWAY STARTING FROM MAJOR BRIDGE OVER TAKLI RIVER NEAR NAYAGAON JAGEER VILLAGE TO RAJASTHAN/MP BORDER (CH. 427.300 TO CH. 452.425) SECTION OF DELHI-VADODARA ACCESS CONTROLLED GREEN FIELD ALIGNMENT (NH-148N) UNDER BHARATMALA PARIYOJANA IN THE STATE OF RAJASTHAN ON EPC
Client – Dineshchandra R. Agrawal Infracon Pvt. LTD
Tender Amount - 650.24 Cr.

Project On Going

Construction Of Missing Link From Birhu To Lathiani Into 4-lane &paved Shoulder Configuration From Km 35/550 (Design Chainage 0.000) To 42/800 (Design Chainage 8.153) On Nh- 503a Including Cable Stayed Bridge (0.860 Km) On Back Water Of Govind Sagar Reservoir And Its Approaches In Himachal Pradesh On Engineering, Procurement And Construction (Epc) Mode.
Client – S.P. Singla Constructions Pvt Ltd.
Tender Amount - 613.68 Cr.

Project On Going

4 Laning From Godibandha To Ballahar Chhak Ballahar Chhak Banarapal And Banarapal To Start Anugul By Pass At Km 314.130 To Km 321.035 Of Nh 53 At Km 75.200 To Km 84.000 Of Nh-149 At Km 84.000 To Km 85.750 Of Nh 55 Under Nh(O) On Ham In Odisha.
Client – Agrawal Infrabuild Private Limited
Tender Amount - 567.8 Cr.

Project On Going

Construction Of 6-lane Access Controlled Greenfield Highway From Km 35+000 To Km 67+000 Of Rajasthan/gujarat Border To Santalpur Section Of Nh-754k As A Part Of Amritsar Jamnagar Economic Corridor In The State Of Gujarat On Epc Mode Under Bharatmala Pariyojana (Phase-i) (Aj/rgbspack Age-2)
Client – Ravi Infra Build Projects Pvt. LTD
Tender Amount - 550.05 Cr.

Project On Going

Development Of Six Lane Karki- Kaliagura Section Of Nh-130-cd Road From Km 226+500 To Km 249+000 Under R AI Pu R-v Is A K H A P Atn Am Economics Corridor In The State Of Odisha On Hybrid Annuity Mode (Package- Od-4) (Length22.500 Km)
Client – Nkc Projects Pvt LTD
Tender Amount - 483.01 Cr.

Project Completed

Development Of Six Lane Dhanara- Hatibena Section Of Nh-130-cd Road From Km 124+611 To Km 146+500 Under R Aipu R-v Is A K H A P Atn Am Economics Corridor In The State Of Odisha On Hybrid Annuity Mode (Package- Od-1) (Length21.839 Km)
Client – Nkc Projects Pvt LTD
Tender Amount - 472.10 Cr.

Project Completed

Detail Engineering For Construction Of 6 Lane Access Controlled Greenfield Highway From Km.1.900 To Km 30.000 Of Rasisar To Panchu- Rajasthan Section Of Nh-754k As A Part Of Amritsar- Jamnagar Economic Corridor In The State Of Rajasthan On Epc Modeunderbharatmalapariyojana (Phase !) Total Length-169.6kms
Client – Nkc Projects Pvt LTD
Tender Amount - 446.63 Cr.

Project Completed

Development Of Jhajra - Asharori Link Road (Design Ch 0.050 To Ch 12.220) In The State Of Uttarakhand On Epc Mode
Client – M/s Vaaman Infra Engineering Pvt. LTD
Tender Amount - 438.62 Cr.

Project Completed

Construction Of Four Lane Expressway From Vejalka Village To Start Of Dsir Zone Of Ahmedabad District B- 1 (Ch. 48+520 To 71+060) Section Of Ahmedabad-dholera Greenfield Alignment (Ni1-751) On Epc Mode Under Bharatmala Pariyojana In The State Of Gujarat
Client – Ghv (India) Pvt. LTD
Tender Amount - 434.72 Cr.

Project Completed

Four Laning Of Dive Ghat - Hadapsar Section Of Nh-965 In The State Of Maharashtra On Ham Mode Under Nh(0). Design Ch 220.900 Km To Ch 234.150 Km)
Client – R&c Infraengineers Private Limited
Tender Amount - 399.02 Cr.

Project On Going

Rehabilitation & Widening Work For 2-lane/ 2- Lane With Paved Shoulder Of Existing Nh-80 From Km 70.15 To Km 121.025 Of Munger- Sultanganj Bii Ag Alpursection In The State Of Bihar
Client – J K Associates
Tender Amount - 398.88 Cr.

Project Completed

Rehabilitation And Up-gradation Of Road From Km 46.597 To Km 66.845 (Total Length: 20.248 Km) Of Kanchanpur- Vaghmun Section On Nh-44a To Two Lane With Paved Shoulder In The State Of Tripura On Epc Basis (Package-iii)
Client – Rs Bhamboo Construction Pvt LTD
Tender Amount - 347.36 Cr.

Project Completed

Four Laning Of Takoli To Kullu Section Of Nh-21 (Km 242+000 To Km 272+000) Under Nhdp-ivb On Epc Mode In The State Of Himachal Pradesh (Design Length-28.690 Km)
Client – Nkc Projects Pvt LTD.
Tender Amount - 328 Cr.

Project Completed

Upgradation Of Bacchaun - Chandla - Sarwai - Gorihar Chandrapura Road (Up-mp Border) (Sh-5) From Design Ch 0+000 To Design Ch 57+640 Km In The State Of Madhya Pradesh Total Length 57.64 Km, Two Lane With Paved Shoulder Configuration In The State Of Madhya Pradesh On Epc Mode
Client – Gour Road Tar Coat Pvt Ltd.
Tender Amount - 299.56 Cr.

Project On Going

Construction Of 1 Rob & 3 Flyovers In National Highways No. 730 At The Section From Km 133+230 To Km 134+330, Km 134+550 To Km 135+650, Km 136+200 To Km 137+800 In The State Of Uttar Pradesh (Approx 3.8 Km)
Client – Ravi Infra Build Projects Pvt. LTD.
Tender Amount - 257.2 Cr.

Project Completed

Rehabilitation And Up-gradation From Single Lane To Two Lane With Paved Shoulder From Existing Km 195.175 To Km 220.00 (Design Chainage From Km 71.300 To Km 95.947 Paligad To Jankichatti) On Nh 134 In The State Of Uttarakhand Under Epc Mode
Client – Yashmita Infrastructure and Developers Pvt. Ltd.
Tender Amount - 256.92 Cr.

Project On Going

Development Road Section Road From Junction Existing To 4-lane Talwandi With With Sabo-raman Paved Bathinda 131.600 Km To Dabwali Km Shoulders Road To Road 155.650) Of (Design For Refinery Nh-254 The Km 131+600 To Km 152+600) In The State Of Punjab On Epc Mode (Length 21.00km)
Client – J.k.a Associates Pvt. LTD
Tender Amount - 227.83 Cr.

Project Completed

Improvement And Strengthening Of Existing 2 Lane Stretch To 2 Lane Paved Shoulder (1.5 M Bhs) On Ghoti-sinnar Section Of Nh-160a From Km.0.000 To Km.53.500 Using Thin White Topping (200 Mm Thick) The State Of Maharashtra On Epc Mode.
Client – Sunny Infraprojects Private Limited
Tender Amount - 200.58 Cr.

Project On Going

Construction Of 4 Lane Elevated Corridor From Near Madiaon To Iim Crossing (Km 486.285 To Km 488.231) On Lucknow-sitapur Section Of Nh-24 On Epc Mode
Client – M/s Kaluwala Construction Pvt. LTD
Tender Amount - 194 Cr.

Project Completed

Four Lanning Of Nh‐114a From Km.65.500 (Tower Chowk, Dumka) To Km 87.475 (Basukinath) (Excluding 84.950 To 85.785 Km) In The State Of Jharkhand Under Ham Mode
Client – Allone Infra Pvt Ltd.
Tender Amount - 189.36 Cr.

Project On Going

Construction Of 2 Lane Relief Highway From Ghogripur To Delhi Border (Near Hareveli Village) Section From Ch. 57+250 (Panipat-sonipat District Border) To Ch. 82+700 (Barwasm) Falling In Sonipat Distt. Including Improvement With Bituminous Overlay From 82+700 (Barvvasni) To Ch 104.042 (Delhi Border)
Client – Haryana State Roads And Bridges Development
Tender Amount - 186.16 Cr.

Project Completed

Construction And Up-gradation Of Existing Road To 2-lane With Paved Shoulder Of Bagrakot-kafer Section Of Nh-717a From Km 13.000 To Km 25.600 On Epc Basis Under Sardp-ne Phase’a’ In The State Of West Bengal Packageiv B(2nd Call)
Client – Rani Constructions Pvt. LTD- Sscipl Jv
Tender Amount - 184.45 Cr.

Project On Going

Construction Of Lateral & Axial Roads In The State Of Punjab & Rajasthan Along The Indo- Pakistan Border-(Sh:- Lateral Road, Jaisalmer North Sector, Package-i) Including 5 Years Maintenance (On Epc Mode).
Client – Krishang Infrawell LLP
Tender Amount - 141.94 Cr.

Project On Going

Construction And Upgradation Of Existing Road To 2-lane Nhdl Specification From Existing Chainage Km 0+000 To Km 18+530 (Design Ch- Km 0+000 To Km 17+350) Of Road Kurkuti Ghamsali Niti (Kgn) In 21 Brtf Area Under Project Shivalik In Uttarakhand State On Epc Mode (Length-17.35km)
Client – Oasis Projects Limited
Tender Amount - 132.74 Cr.

Project On Going

Landslide Treatment Work Of 08 Locations (Ch. 238.750 Km To 238.920 Km, Ch. 246.790 Km To 246.850 Km, Ch. 247.340 Km To 247.440 Km, Ch. 254.340 Km To 254.410 Km, Ch. 261.550 Km To 261.680 Km, Ch. 281.600 To Ch. 281.925 Km, Ch. 283.250 Km To 283.500 Km, Ch. 289.400 Km To 289.610 Km) On Nh-07 (Old Nh-58) From (Shivpuri To Devprayag Section) Under Epc Mode In The State Of Uttarakhand Under Annual Plan 2024-25
Client – KCC Buildcon Pvt. Ltd.
Tender Amount - 71.46 Cr.

Project Completed

Construction Of 1 Rob & 3 Flyovers In National Highways No. 730 At The Section From Km 133+230 To Km 134+330, Km 134+550 To Km 135+650, Km 136+200 To Km 137+800 In The State Of Uttar Pradesh (Approx 3.8 Km)
Client – Ravi Infra Build Projects Pvt. LTD.
Tender Amount - 257.20 Cr.

Project Completed

REHABILITATION AND UP-GRADATION OF DERGAON TOWN TO 4 LANING FROM KM. 426.800 TO KM 437.400 ON NH-37 IN THE STATE OF ASSAM ON ENGINEERING, PROCUREMENT& CONSTRUCTION(EPC) MODE
Client – NG PROJECTS PVT LTD
Tender

Project Completed

CONSTRUCTION OF VUP, SERVICE ROAD AT KM. 17.325 IN VILLAGE BEHRAM ON PHAGWARA-RUPNAGARSECTION OF NH-344A IN THE STATE OF PUNJAB ON EPC MODE.
Client – SHIVRAJ INFRA
Tender -

Project Completed

DETAIL ENGINEERING FOR CONSTRUCTION OF TWO LANE SASARAM BYE PASS ROAD (BEDA TO MOKAR, 0.0 TO 9.0 K.M.)WITH EARTHEN SHOULDER INCLUDING R.O.B./BRIDGES OVER BANK OF IRRIGATION CANAL IN THE DISTRICT OF ROHTAS IN THE STATE OF BIHAR ON ENGINEERING, PROCUREMENT & CONSTRUCTION(EPC) MODE
Client – MG CONTRACTOR PVT LTD

Project Completed

THE PROJECT ROAD STARTS NEAR JATWAI VILLAGE IN BULANDSHAHAR DISTRICT AT CH. 19+900 AND ENDS AT CH. 56+020 NEAR DIBAI AT THE MEETING POINT OF NH 93 (CH 120.700) AND SH 13 (CH 116.320). THE TOTAL LENGTH OF THE PROJECT ROAD IS KMS 36.120.
Client – ATLAS CONSTRUCTIO N PVT LTD

Project On Going

REHABILITATION AND UPGRADATION FOR FOUR LANING OF SAHA TO SAHABAD SECTION FROM KM.14.840 TO KM. 31.760 OF NH-444A (TOTAL LENGTH = 16.920 KM) UNDER BH A R ATM A LA PA RIYO J ANA IN THE STATEOF HARYANA.
Client – M/S SHIV BUILD INDIA PVT. LTD JV KALUWALA CONSTRUCTION PVT. LTD

Project On Going

DETAIL DESIGN ENGINEERING CONSULTANCY SERVICES FOR FEASIBILITY STUDY AND PREPARATION OF DETAILED PROJECT REPORT FOR IMPROVEMENT AND UP-GRADATION FOR PACKAGE- 3 LOT 4 OF BHARATMALAROADPROJECT(AJ/RD-LOT-4,PACKAGE-1)
Client – RAVI INFRA BUILD PROJECTS PVT. LTD

Project Completed

UPGRADATION AND MAINTENANCE OF MDR NO. 58W BULANDSHAHAR ANOOPSHHAR SECTION FROM KM 19.9(H) TO 56.020 (LENGTH 36.12 KM) IN DISTRICT BULANDSHAHAR, UTTAR PRADESH ON EPC MODE.
Client – ATLAS CONSTRUCTION PVT LTD

Project Completed

Improvement & Up-gradation Of NH-734 Section Of Moradabad - Thakurdwara - Kashipur Including Moradabad & Kashipur Bypass Onepc Basis In The State Of Uttarakhand Package-iii : Kashipur Bypass(Length=14.490km.), Starts From CH. 38+770(Near UP/UK Border) Andends At CH. 53+260 (Existing CH. 05+560 Of NH-309)
Client – RAJ Corporation Ltd.

Project Completed

Improvement/Widening Of National Highway No. 217 (DainadubiDarugiri Section) to Two Lane With Paved Shoulder In The State Of Meghalaya, From Design Km 0+000 To Km 40+840 (Design Length= 40.840 Km) (Existing Km 8+600 To Km 53+000 Of Old NH 62) Under Bharatmala Pariyojana (Lot‐1) Pkg‐1b On EPC Mode.
Client – Allone Infra Pvt Ltd.

Project Completed

Rectification Of 2 Number Black Spots- Package 4 Maheshwar (65+338 To 65+746,66+175 To 66+885) And Km 70+684 To 71+310 Km (Chichi Mata) I.e.1+744 Km Section District Samba In The Union Territory Of Jammu & Kashmir Onepcmode
Client – CEIGALL INDIA LTD.

Project Completed

Construction & Upgradation To 2-lane With Paved Shoulder From Design Km. 67+805 (End Of 83rd Km Tunnel) To Km 80+675 (Start Of Kistwar Bypass) Of 12.870 Km Length On Khellani– Kishtwar–chattroo Section Of Nh-244 In The Union Territory Of Jammu & Kashmir On EPC Mode (Pkg Iii)
Client - R&B INFRA PROJECTS PVT.LTD.

Project Completed

Construction and up gradation of existing road to 2-lane with paved shoulder including geometric improvement of Kafer to Lava More section from Km40+000toKm61+100ofNH-717AonEPCbasisunderSARDP-NE Phase ‘A’ in the state of West Bengal (Package-V A)
Client - RANI CONSTRUCTIONS PVT. LTD- SSCIPL JV

Project Completed

Rehabilitation and up-gradation of 2 lane with paved shoulders of Keifang section (Economic corridor) from Existing km 15+000 to km 30+050 (Design chainage Km 13+510 to km 27+400) (Pakcage-II) of NH-6 in the state of Mizoram Under BharatmalaPariyoznaon EPC mode.
Client - NG PROJECTS PVT LTD

Project Completed

Rehabilitation and Up-gradation of Keifang– Rulchawm section (Economic corridor) of NH-6 from Existing Chainage Km 30+050 (Keifang) section to Km 50+360 (Rulchawm) (Design chainage Km 27+400 to Km 45+040) (Package-III) in the state of Mizoram under Bharatmala Pariyozna on EPC mode
Client - NG PROJECTS PVT LTD

Project Completed

Construction Of 2/4 Lane With Paved Shoulders Of Shillong Western Bypass Starting From NH-06 Near Ladumsaw (Existing Km 60.900 Of Old NH40) To NH106 (Old Nh 44e) (Package-iii), From Km 24+700 To Km 38+256 Under Sardp-ne 'phase A' In The State Of Meghalaya On EPC Mode
Client - BRN INFRA

Project Completed

ENGAGEMENT OF DDC FOR DETAILED DESIGN OF TWO NUMBER OF RRTS ELEVATED STATTIONS (I.E SARAI KALE KHAN AND NEW ASHOK NAGAR INCLUDING MULTIMODAL INTEGRATION SCHEME). APPROX. 11 KM ELEVATED VIADUCT (FROM SARAI KALE KHAN UPTO ELEVATED RRTS RAMP NEAR KHICHRIPUR AND SARAI KALE KHAN TO JUNGPURA STABLING YARD AND DETAILED MASTER PLAN OF APPROX. 12 HA. LAND PARCEL AT JUNGPURA.
Client – TANDONS PVT. LTD

Project On Going

CONSTRUCTION OF 2-LANE WITH PAVED SHOULDER FROM SHAHPURA EXISTING KM 0.000 (DESIGN CHAINAGE 0+000) TO THANAGAZI EXISTING KM 37+352 (DESIGN CHAINAGE 36+810) OF NH -248A ON EPC MODE IN THE STATE OF (JOB NO. NH 248A/RJ/2021-22/790)
Client – STS-NB JV

Project Completed

CONSTRUCTION OF SIX LANE FLYOVER AT THE JUNCTION OF BHANKROTA (CH.278+278), NARSINGHPURA (CH.282+640), MAHALAN (CH.301+090), MOKAMPURA (CH.312+347), PADASOLI (CH.339+879) AND CONSTRUCTION OF THREE LANE FLYOVER AT HEERAPURA JUNCTION (CH.275+891) ON JAIPUR KISHANGARH SECTION OF NH-8 (NEW NH-48) IN THE STATEOF RAJASTHAN
Client - J K ASSOCI ATES

Project On Going

CHANGE OF ALIGNMENT OF NH-15 (JAISALMER-BARMER-SECTION) FROM KM. 123/410 TO KM. 144/500 IN VIEW OF MINES AREA BENEATH NH-15 FOR POWER PLANT INSTALLATION AT BARMER DISTRICT IN THE STATE OF RAJASTHAN ON EPC MODE.
Client - RADHA KISHAN INFRA DEVELOPERS PVT. LTD

Project On Going

SIX LANING ALONG WITH FULL ACCESS CONTROL PROVISIONS IN STRETCHES FROM SAHARANPUR BYPASS TO GANESHPUR SECTION OF DELHI DEHRADUN EC IN UTTAR PRADESH ANDUTTARAKHANDON EPCUNDERBMPPHASE-1(PACKAGE-2
Client – M/S PAWAN KUMAR JV EVRASCON

Project Completed

CONSTRUCTION OF (I) WHITE TOPPING ON THE EXISTING BITUMINOUS CARRIAGEWAY & SERVICE ROAD FROM KM. 381.000 TO KM 502.000 (II) VUP WITH SERVICE ROAD AT DELHI DARBAR KM.499.150 (20M X 5.5M) (III) VUP WITH SERVICE ROAD AT PANDURANWADI KM 501.250 (20M X 4.5M) (IV) LVUP WITH SERVICE ROAD AT SATIVALI KM.454.180 (12M X 4.0M) & (V) SAFETY MEASURES ON SURAT-DAHISAR SECTION OF NH-48 IN THE STATE OF MAHARASHTRA (2ND CALL
Client - NIRMAL BUILD INFRA PVT. LTD.

Project Completed

CONSTRUCTION & UP GRADATION OF EXISTING ROAD TO 2-LANE WITH HARD SHOULDER FROM EXISTING CHAINAGE KM 0.00 TO KM 50.987OF NH-07 (OLD NH-58) (MANA TO MANA PASS) ON EPC MODE IN THE STATE OF UTTARAKHAND. (LENGTH – 50.987 KM)
Client – BORDER ROADS ORGANISATION

Project Completed

REHABILITATION & UPGRADATION OF EXISTING ROAD BETWEEN KM 480+950 TO KM 489+350 (JOSHIMATH-MARWARI) NHSL TO INTERMEDIATE LANE SPECIFICATION ON RISHIKESH JOSHIMATH-MANA ROAD (NEW NH-07) IN THE STATE OF UTTARAKHAND (LENGTH 8.40 KM)
Client – OASIS PROJECTS LIMITED

Project Completed

CONSTRUCTION OF 2-LANING WITH HARD SHOULDER CONFIGURATION OF LUNGLEI - CHHUMKHUM – TLABUNG FROM DESIGN CHAINAGE KM 0.000 TO KM 74.950 [PKG - A&B] FOR LUNGLEI-TLABUNG SECTION OF NH-302 IN THE STATE OF MIZORAM UNDER 'BHARATMALA PARIYOJANA' ON EPC MODE
Client – BRN INFRA

Project Completed

REHABILITATION AND UPGRADATION TO TWO-LANE CONFIGURATION OF KARNOHAL-KALWAHN SECTION (KM 181.000 TO KM 208.950) OF NH - 70 IN THE STATE OF HIMACHAL PRADESH UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT (GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE.
Client – BRN INFRA

Project On Going

CONSTRUCTION OF 2-LANE AIZAWL BYPASS FROM KM 0.000 TO KM 10.600 (PACKAGE-1) ON SAIRANG PHAIBAWK SECTION OF NH-6 IN THE STATE OF MIZORAM UNDER BHARATMALA PARIYOJNA ON EPC MODE
Client – BRN INFRA

Project Completed